Suspended center-hung scoreboard display glowing above an indoor basketball arena during a live game
Center-Hung Scoreboards

Suspended 360° Displays Built for Every Seat

Multi-sided center-hung scoreboard cube displays engineered for replay, live data, and unified match-day control — locked to your perimeter, entry, and broadcast systems with sub-10ms sync.

4-sided and 8-sided configurations
1.2mm–6.25mm pixel pitches
Structural rigging & safety certified
Sub-10ms multi-screen sync
7/24 Service Online 180-360° Sided Options <10ms Sync Latency 1.2T+ Rigging Load
RIGGING · CEILING MOUNT
STATS
58%
LIVE · Q3 07:42
HOME LIONS
92–88
AWAY HAWKS
Possession 58 / 42
Rebounds 31 / 24
Timeout 2 left
REPLAY · #23 DUNK SPONSOR · Q3 ROTATION REPLAY · #23 DUNK SPONSOR · Q3 ROTATION
REPLAY
▶ 00:42
4-SIDED CONFIG 1.2T RIGGING LOAD ALL FACES SYNCED
Technical Specification

Configured for Your Venue’s Sightlines

Center-hung scoreboard cube displays are not one-size-fits-all. Every system is specified around your arena’s geometry, ceiling structure, and broadcast requirements.

CENTER-HUNG · SPEC SHEET v2.4 / 2026
Pixel Pitch
P1.2 – P6.25
Indoor-rated SMD
Brightness
1,200-4,500 nits
Auto-dimming
Faces
4 / 8 Sided
Configurable
Refresh Rate
3840 / 7680 Hz
Broadcast-grade
Sync Latency
< 10 ms
All faces locked
Rigging Load
1.2T+
Structural certified
FRONT Serviceable CE / FCC Certified 3-YEAR Warranty
CUBE CONFIGURATION 2 OPTIONS
8-sided center-hung LED scoreboard cube in a large indoor arena — eight faces providing maximum visibility from every seating tier Cube · P4 8-SIDED
8-Sided Cube ADVANCED
Eight faces stadium LED display for maximum visibility — ideal for large arenas with upper-tier seating on all sides.
Large Arenas Multi-Sport Broadcast
Multi-Face Content Distribution

Every Face Has a Job

A center-hung cube is not a single screen — it’s a distribution system. Each face serves a different audience angle with different content priorities, all locked to one control platform.

CUBE · CONTENT MAP 4-FACE LAYOUT
MAIN STAND MAIN
OPPOSITE SIDE STAND
BROADCAST CAM
SIDE STAND SIDE
F · 01
Score · Clock · Period Core match data — always visible on the main-stand face.
F · 02
Stats · Possession · Fouls Live statistics for the opposite stand — keeps every seat engaged.
F · 03
Instant Replay · Highlights Multi-angle replay feed synced to broadcast delay for on-site fans.
F · 04
Sponsor Rotation · Broadcast Feed Sponsor content aligned with broadcast camera exposure and match phase.
All four faces center-hung scoreboard run on one control platform, locked to a shared frame clock — so a replay appears on all faces with sub-10ms latency, not as a cascade.
Rigging & Structural Engineering

Suspended Safely, Engineered to Last

A center-hung scoreboard is a piece of suspended structure, not just a screen. Every system is designed against your venue’s ceiling loads, with full rigging drawings and certified safety factors.

RIGGING · STRUCTURAL VIEW SECTION A-A
SAFETY WIRE SECONDARY
RIGGING POINT 4 × LOAD CELL
HEIGHT · 3.2–5.5 m
CENTER-HUNG CUBE 1.2 T 4-SIDED · P6 INDOOR
ENGINEERING DATA
  • Total System Weight Cube, modules, frame, and cabling combined.
    1.2 T
  • Safety Factor Rated to 8× the working load on all rigging points.
    8 : 1
  • Rigging Points Four independent load points with individual load cells.
    4 × CELL
  • Secondary Safety Wire Independent fall-arrest system, certified to EN 795.
    EN 795
  • Mount Height Range Typical arena installation height above court level.
    3.2 – 5.5 M
  • Structural Review Full rigging drawings approved by a licensed structural engineer.
    Stamped
CE Certified EN 795 Safety Wire DIN 56950 Stage Load TÜV Reviewed
Signal & Broadcast Integration

From Timing Desk to Every Face

A center-hung LED display cube is a signal hub, not just a display. Score, clock, replay, sponsor, and broadcast feeds all converge on one processing core — then distribute to every face with sub-10ms sync.

SIGNAL ROUTING · 4-FACE OUTPUT ALL INPUTS LIVE
Timing & Scoring Scoreboard desk · ODF
Replay Server Multi-angle HD feed
Sponsor System CMS · Schedule API
Processing Core Unified Control Platform All inputs converge here. Frame-locked, resolved, and re-distributed to each face.
< 10 MS 4K / 8K API
F · 01
Score · Clock Main stand
F · 02
Stats · Possession Opposite stand
F · 03
Replay · Highlights Broadcast angle
F · 04
Sponsor · Feed Side stand
Inputs Any Timing or Broadcast System Connect ODF, Genius Sports, or your own timing feed — no middleware required.
Processing One Frame-Locked Core All inputs resolved to one shared clock, then split to each face with sub-10ms latency.
Outputs Per-Face Content Routing Each face receives its own content stream — no cloning, no cascading.
Indoor basketball arena with a suspended 4-sided center-hung LED cube — case study of an installed arena display system
Case Study · Project Dossier

Suspended in Under 90 Days

A 4-sided center-hung LED display cube delivered to a Southeast Asian indoor arena — from structural review to first live match in under three months.

CASE · 2024 · AS-12 LIVE & OPERATIONAL Indoor Basketball Arena · Southeast Asia
PROJECT TIMELINE
  • 01 / REVIEW
    Structural Review & Rigging Design Ceiling load analysis, four rigging points, and stamped engineering drawings.
    Wk 1–2
  • 02 / BUILD
    Cube Manufacturing & Pre-Assembly Full 4-face cube pre-assembled and power-tested before shipment.
    Wk 3–7
  • 03 / SHIP
    Logistics & Site Staging Cube shipped in modular sections, staged at venue ahead of rigging window.
    Wk 7–9
  • 04 / LIFT
    On-Site Rigging & Alignment Cube lifted to 4.2m, aligned, safety-wired, and load-tested on-site.
    Wk 9–11
  • 05 / SYNC
    Multi-Face Sync & Handover All 4 faces frame-locked to timing system and replay feed, trained, live.
    Wk 11–12
RIGGING DATA
1.2 T
MOUNT HEIGHT · 4.2 M
Faces 4-Sided
Pixel Pitch P6
Total Weight 1.2 T
Delivery Time 12 Weeks
Sync Latency < 10 ms
Uptime (Y1) 99.6%
Delivered by GOBLED Sports
Turnkey System · 2024 Q4

The rigging team finished the lift ahead of schedule, and the four faces synchronized perfectly with our timing system on day one. What impressed us most was that all four faces run from one control room — no extra staff needed on match day.

Arena Operations Manager · Indoor Basketball Arena
Frequently Asked

Questions Before You Order

The four questions arena operators ask us most often — safety, configuration, spare parts, and lead time.

Every center-hung scoreboard cube is engineered against a 1:8 safety factor on all rigging points. Safety is achieved through multiple independent layers:
  • Four independent load points, each with its own load cell
  • Secondary safety wire certified to EN 795
  • Stamped structural drawings from a licensed engineer
  • On-site load test before first live match
All hardware is CE and DIN 56950 compliant.
It depends on your arena geometry. As a rule of thumb:
  • 4-sided works for most indoor arenas with seating on four sides — 1 main face, 3 stat/replay faces
  • 8-sided suits large arenas with upper-tier seating on all sides, and venues that need extra sponsor-facing surfaces
  • For a center-hung display in a multi-sport venue used with different orientations, 8-sided is often the more flexible choice
Our engineers confirm the right configuration from your arena’s seating layout.
Every stadium center-hung scoreboard project includes a recommended spare parts kit (typically 2–5% of total module count) stocked locally for fast replacement. Because center-hung cubes are elevated, all modules are front-serviceable — no disassembly from above or specialized access equipment required.

The same module design stays in production for a minimum of 7 years after delivery, so replacements match the original color and brightness. Remote monitoring through the Operations platform flags failures before they affect a match.
For a typical 4-sided center-hung LED display cube, the full cycle from signed agreement to first live match is 10 to 14 weeks. This includes:
  • Structural review and stamped drawings
  • Factory pre-assembly and QC
  • International freight and customs
  • On-site rigging and load testing
  • Multi-face sync and operator training
Lead time depends primarily on the structural review phase, which we start as soon as the venue’s ceiling documentation is available.
Still have a question on center-hung scoreboard? Talk to our engineering team →
Venue Assessment

Get a Real Center-Hung Cube Quote

Send us your arena dimensions, ceiling structure, and target timeline. Our engineers will respond with a line-by-line system quote — including rigging design and multi-face content plan.

Request a Venue Assessment
  • 4 / 8 Sided Options
  • 1:8 Safety Factor
  • Stamped Rigging Drawings
  • < 10 ms Multi-Face Sync
Quick Inquiry