
Suspended 360° Displays Built for Every Seat
Multi-sided center-hung scoreboard cube displays engineered for replay, live data, and unified match-day control — locked to your perimeter, entry, and broadcast systems with sub-10ms sync.
Configured for Your Venue’s Sightlines
Center-hung scoreboard cube displays are not one-size-fits-all. Every system is specified around your arena’s geometry, ceiling structure, and broadcast requirements.
Every Face Has a Job
A center-hung cube is not a single screen — it’s a distribution system. Each face serves a different audience angle with different content priorities, all locked to one control platform.
Suspended Safely, Engineered to Last
A center-hung scoreboard is a piece of suspended structure, not just a screen. Every system is designed against your venue’s ceiling loads, with full rigging drawings and certified safety factors.
- Total System Weight Cube, modules, frame, and cabling combined.1.2 T
- Safety Factor Rated to 8× the working load on all rigging points.8 : 1
- Rigging Points Four independent load points with individual load cells.4 × CELL
- Secondary Safety Wire Independent fall-arrest system, certified to EN 795.EN 795
- Mount Height Range Typical arena installation height above court level.3.2 – 5.5 M
- Structural Review Full rigging drawings approved by a licensed structural engineer.Stamped
From Timing Desk to Every Face
A center-hung LED display cube is a signal hub, not just a display. Score, clock, replay, sponsor, and broadcast feeds all converge on one processing core — then distribute to every face with sub-10ms sync.

Suspended in Under 90 Days
A 4-sided center-hung LED display cube delivered to a Southeast Asian indoor arena — from structural review to first live match in under three months.
-
01 / REVIEWStructural Review & Rigging Design Ceiling load analysis, four rigging points, and stamped engineering drawings.Wk 1–2
-
02 / BUILDCube Manufacturing & Pre-Assembly Full 4-face cube pre-assembled and power-tested before shipment.Wk 3–7
-
03 / SHIPLogistics & Site Staging Cube shipped in modular sections, staged at venue ahead of rigging window.Wk 7–9
-
04 / LIFTOn-Site Rigging & Alignment Cube lifted to 4.2m, aligned, safety-wired, and load-tested on-site.Wk 9–11
-
05 / SYNCMulti-Face Sync & Handover All 4 faces frame-locked to timing system and replay feed, trained, live.Wk 11–12
Turnkey System · 2024 Q4
The rigging team finished the lift ahead of schedule, and the four faces synchronized perfectly with our timing system on day one. What impressed us most was that all four faces run from one control room — no extra staff needed on match day.
Questions Before You Order
The four questions arena operators ask us most often — safety, configuration, spare parts, and lead time.
- Four independent load points, each with its own load cell
- Secondary safety wire certified to EN 795
- Stamped structural drawings from a licensed engineer
- On-site load test before first live match
- 4-sided works for most indoor arenas with seating on four sides — 1 main face, 3 stat/replay faces
- 8-sided suits large arenas with upper-tier seating on all sides, and venues that need extra sponsor-facing surfaces
- For a center-hung display in a multi-sport venue used with different orientations, 8-sided is often the more flexible choice
The same module design stays in production for a minimum of 7 years after delivery, so replacements match the original color and brightness. Remote monitoring through the Operations platform flags failures before they affect a match.
- Structural review and stamped drawings
- Factory pre-assembly and QC
- International freight and customs
- On-site rigging and load testing
- Multi-face sync and operator training
Get a Real Center-Hung Cube Quote
Send us your arena dimensions, ceiling structure, and target timeline. Our engineers will respond with a line-by-line system quote — including rigging design and multi-face content plan.
Request a Venue Assessment- 4 / 8 Sided Options
- 1:8 Safety Factor
- Stamped Rigging Drawings
- < 10 ms Multi-Face Sync