
Stadium Venues. Integrated Systems.
A selection of stadium, arena, and training centre projects we have delivered and continue to operate. Each project covers the venue, the system we built, and the results after go-live, contact us for more stadium LED display case studies.
Stadium LED Display Case Studies – Project Archive
Filter by venue type to see how we have delivered systems across football stadiums, basketball arenas, multi-sport venues, and training centres.
Perimeter · P6Premier Football Club Stadium
Northern Europe
Center-Hung · 8-SidedNational Basketball Arena
East Asia
3-Court Data HubProfessional Academy Campus
Northern Europe
4 Zones · Shared HubCity Multi-Sport Venue
Middle East
Perimeter · 320 MNational Football Stadium
Southeast Asia
Center-Hung · 4-SidedRegional Basketball Arena
Central Europe
4 Courts · Analysis WallNational Training Centre
Western Europe
Perimeter · P8Regional Football Stadium
Southern Europe
Unified Platform · 5 SportsUniversity Sports Complex
North America
Court-Side Ring · 4 SidesCommunity Basketball Gym
Southeast Asia
Training Centre · P2.5Club Training Centre
Central Europe
Perimeter + Main SBMunicipal Football Ground
South AmericaA Premier Stadium in 11 Weeks
One of our most complete projects — full perimeter LED system, main scoreboard, and operations contract, delivered inside a single off-season window.
Premier Football Club Stadium
A 32,000-seat top-division football stadium with a broadcast contract for domestic league coverage. The club was upgrading from a 10-year-old single-line perimeter system that had become unreliable on camera.
The entire installation had to happen inside a 9-week off-season window. Perimeter panels had to meet broadcast refresh requirements for TV close-ups. The main scoreboard had to integrate with the existing timing system without replacing it.
A full perimeter LED ring at P6mm pitch, a main broadcast scoreboard, and an operations contract that includes match-day remote support. All screens run on our own sports control platform — no external media server.
First match-day went live with zero screen failures. Broadcast team confirmed the new perimeter passes TV close-up standards. The system has run for over 40 home fixtures since launch with no unplanned downtime.
Perimeter + Main Scoreboard · 2025 Q2
We had one off-season to replace the entire perimeter system and the scoreboard — no second window. The team worked night shifts around the pitch renovation, and on the first home game everything was up. Two seasons in, we have not had a single unplanned screen outage. That is the part that matters most to us.
What 30+ Venues Add Up To
Individual cases tell individual stories. These numbers of stadium LED display case studies show what the whole portfolio looks like after delivery.
Across 24 countries — from community gyms to national broadcast arenas. Every one scoped, built, and operated by our own team.
Square metres of sports-grade display currently running on our control platform — with daily system health checks from our GobLED operations team.
Across all venues under active operations contracts. Measured per match-day and per training session, not annualised.
From signed contract to first live match day. Every project we delivered in 2025 finished inside its agreed window.
Not “delivered and handed over” — still running, still monitored, still maintained by the same team that built them. This is why our clients do not go back to tender.
Want the Next Case Study to Be Your Venue?
12 projects on this page. 108+ more in the full archive. Every one of them started the same way — with a venue assessment and a conversation about what the venue actually needs.
Start Your Venue Assessment