Stadium LED display case studies - glowing at night across multiple sports venues
Case Studies

Stadium Venues. Integrated Systems.

A selection of stadium, arena, and training centre projects we have delivered and continue to operate. Each project covers the venue, the system we built, and the results after go-live, contact us for more stadium LED display case studies.

30+ Venues Delivered
24 Countries
99.7% Uptime (Y1)
PROJECT ARCHIVE · INDEX LIVE
FS-21
National Football Stadium Perimeter · 320 M · P6 Outdoor
SE ASIA Running
BA-22
Regional Basketball Arena Center-Hung · 4-Sided · P5 Indoor
EUROPE Running
MS-23
City Multi-Sport Venue Unified Platform · 3 Sports · P4 Indoor
MIDDLE EAST Running
TC-24
Professional Academy Campus 3 Courts · Player Screens · Data Hub
N EUROPE Running
FS-24
Premier Football Club Stadium Perimeter + Main SB · P6/P8 Hybrid
EUROPE Running
BA-25
National Basketball Arena Broadcast Center-Hung · 8-Sided · P4
ASIA Running
6 OF 120+ SHOWN ALL SYSTEMS LIVE ARCHIVE OPEN
All Cases

Stadium LED Display Case Studies – Project Archive

Filter by venue type to see how we have delivered systems across football stadiums, basketball arenas, multi-sport venues, and training centres.

FS-24 Football
Premier football club stadium with full perimeter LED display running at night Perimeter · P6

Premier Football Club Stadium

Northern Europe
Seats 32,000
Perimeter 336 m
Running
BA-25 Basketball
National basketball arena with 8-sided center-hung scoreboard above the court Center-Hung · 8-Sided

National Basketball Arena

East Asia
Seats 14,500
Center-Hung 8-Sided P4
Running
TC-24 Training
Professional academy campus with three training courts and central data hub display 3-Court Data Hub

Professional Academy Campus

Northern Europe
Courts 3
Athletes 220+
Running
MS-23 Multi-Sport
City multi-sport venue with unified control platform for four different sports 4 Zones · Shared Hub

City Multi-Sport Venue

Middle East
Sports 4
Switch Time < 60 s
Running
FS-21 Football
National football stadium with 320-meter perimeter LED display Perimeter · 320 M

National Football Stadium

Southeast Asia
Seats 48,000
Perimeter 320 m
Running
BA-22 Basketball
Regional basketball arena with 4-sided center-hung scoreboard Center-Hung · 4-Sided

Regional Basketball Arena

Central Europe
Seats 6,200
Delivery 9 Weeks
Running
TC-25 Training
National training centre with four courts and a central analysis wall 4 Courts · Analysis Wall

National Training Centre

Western Europe
Courts 4
Data Feed Real-Time
Running
FS-22 Football
Regional football stadium with P8 perimeter LED display installed around the pitch Perimeter · P8

Regional Football Stadium

Southern Europe
Seats 18,000
Delivery 7 Weeks
Running
MS-25 Multi-Sport
University sports complex running a unified display platform for five different sports Unified Platform · 5 Sports

University Sports Complex

North America
Sports 5
Control Unified
Running
BA-21 Basketball
Community basketball gym with court-side LED rings running on all four sides Court-Side Ring · 4 Sides

Community Basketball Gym

Southeast Asia
Seats 1,800
Delivery 5 Weeks
Running
TC-22 Training
Club training centre with P2.5 fine-pitch player feedback screens on court-side Training Centre · P2.5

Club Training Centre

Central Europe
Courts 2
Delivery 4 Weeks
Running
FS-25 Football
Municipal football ground with perimeter LED display and main scoreboard Perimeter + Main SB

Municipal Football Ground

South America
Seats 12,500
Delivery 8 Weeks
Running
Showing 12 of 120+ delivered projects Stadium LED display case studies — the full archive is available on request, with venue drawings, system specs, and post-launch results.
Request the Full Archive
Featured Case · Project Dossier

A Premier Stadium in 11 Weeks

One of our most complete projects — full perimeter LED system, main scoreboard, and operations contract, delivered inside a single off-season window.

CASE · 2025 · FS-25 LIVE · STILL OPERATING Premier Football Club · Northern Europe

Premier Football Club Stadium

Northern Europe · 32,000 Seats

A 32,000-seat top-division football stadium with a broadcast contract for domestic league coverage. The club was upgrading from a 10-year-old single-line perimeter system that had become unreliable on camera.

The entire installation had to happen inside a 9-week off-season window. Perimeter panels had to meet broadcast refresh requirements for TV close-ups. The main scoreboard had to integrate with the existing timing system without replacing it.

A full perimeter LED ring at P6mm pitch, a main broadcast scoreboard, and an operations contract that includes match-day remote support. All screens run on our own sports control platform — no external media server.

First match-day went live with zero screen failures. Broadcast team confirmed the new perimeter passes TV close-up standards. The system has run for over 40 home fixtures since launch with no unplanned downtime.

SYSTEM · OVERVIEW
PERIMETER · P6 MAIN SCOREBOARD OPPOSITE STAND 105 × 68 M PITCH ENTRY W ENTRY E
Seats 32,000
Perimeter Length 336 m
Main Scoreboard 120 m²
Perimeter Pitch P6
Refresh Rate 3840 Hz
Install Window 9 Weeks
Home Fixtures 40+
Uptime (Y1) 99.8%
Delivered by GOBLED Sports
Perimeter + Main Scoreboard · 2025 Q2

We had one off-season to replace the entire perimeter system and the scoreboard — no second window. The team worked night shifts around the pitch renovation, and on the first home game everything was up. Two seasons in, we have not had a single unplanned screen outage. That is the part that matters most to us.

Head of Stadium Operations · Premier Football Club
Results Across Projects

What 30+ Venues Add Up To

Individual cases tell individual stories. These numbers of stadium LED display case studies show what the whole portfolio looks like after delivery.

PORTFOLIO · AGGREGATE RESULTS ALL SYSTEMS LIVE
30+
Venues Delivered

Across 24 countries — from community gyms to national broadcast arenas. Every one scoped, built, and operated by our own team.

800K+
LED Modules Online

Square metres of sports-grade display currently running on our control platform — with daily system health checks from our GobLED operations team.

99.7%
Average Uptime · Year 1

Across all venues under active operations contracts. Measured per match-day and per training session, not annualised.

8–11 WKS
Typical Delivery

From signed contract to first live match day. Every project we delivered in 2025 finished inside its agreed window.

The Number That Matters Most
100% of our projects are still operating.

Not “delivered and handed over” — still running, still monitored, still maintained by the same team that built them. This is why our clients do not go back to tender.

100% Still Operating
Want the Numbers Behind Your Venue? We can benchmark your venue against similar projects in our portfolio — real delivery times, real uptime data, real budget ranges. No sales deck.
Request a Benchmark
Your Case Study

Want the Next Case Study to Be Your Venue?

12 projects on this page. 108+ more in the full archive. Every one of them started the same way — with a venue assessment and a conversation about what the venue actually needs.

Start Your Venue Assessment
30+ Venues 24 Countries 100% Still Operating One Partner
Quick Inquiry