Architectural LEDs Built for Daylight
Stadium billboard and facade LED display systems engineered for stadium exteriors, arena entrances, and broadcast camera positions — high-nits daylight brightness, weatherproof sealing, and content management across multiple screens.
Engineered for Daylight Readability
GobLED stadium billboard and facade LED display has one job: stay readable from 50 meters away, in every lighting condition, every hour of the day. That starts with brightness — and ends with weather sealing.
CABINET
01
BILLBOARD
02
FACADE
03Four Layers Between Wall and Screen
Stadium billboard and facade LED display system is not glued to a wall — it is a layered assembly. Each layer handles a different job: structural mounting, display, weather sealing, and thermal ventilation. Here is how it works.
A Billboard That Runs Itself
Stadium billboard and facade LED display runs 24 hours a day, 365 days a year. Content needs to change with the sun, the weather, and the moment — without an operator standing by. This is how we schedule it.
MATCH DAY
MAIN FACADE
TICKETS
SEASON 2026
SPONSOR
ROTATION
BRAND
AMBIENT
Four Screens on One Building
A multi-function stadium billboard and facade LED display installation at a European football stadium — four separate LED surfaces on the building’s exterior, all scheduled from one platform, all running 24/7.
-
01 / SURVEYBuilding Survey & Facade Design Building structure, wind load, sightline, and content flow assessed across four facade positions.Wk 1–2
-
02 / APPROVEStructural Sign-Off & Permits Stamped wind-load drawings submitted, building permit approved, installation window confirmed with venue.Wk 2–5
-
03 / BUILDPanel Production & Pre-Assembly All four surfaces produced as separate systems, pre-assembled, and power-tested before shipment.Wk 5–9
-
04 / INSTALLFacade Mounting & Wiring Mount brackets, cabinet assemblies, and cable routing installed across all four positions during the off-season.Wk 9–12
-
05 / SCHEDULEContent Setup & Handover 24-hour content schedule configured, multi-screen platform tested, operators trained on live content flow.Wk 12–13
Intelligent Billboard
EU-31Turnkey Multi-Display Facade · 2024 Q4
What made this stadium billboard and facade LED display project work was the scheduling platform. Four screens on four different faces of the building, all running different content — but one team manages it from a single dashboard. On match day, the system switches automatically. No one has to stand there and press buttons.
Questions Before You Order
The four questions facility operators ask us most often — daylight readability, structural safety, permits, and content scheduling.
- Stamped structural drawings from a licensed engineer
- Wind-load rating of 2.4 kN/m² as standard (higher for exposed sites)
- IP66 sealed cabinets with triple-sealed front frames
- On-site load verification before handover
- Stamped structural drawings ready for submission
- Planning documentation including brightness, glare, and operating hours
- Local support — our team coordinates with your building consultant or directly with the local authority
- Time of day — different playlists for morning, midday, match hours, evening, and overnight
- Ambient brightness — content brightness follows the light sensor
- Event triggers — match day, ticketing windows, sponsor rotations, and live feed injection
Get a Real Facade System Quote
Send us your building dimensions, facade elevations, and target lighting conditions. Our engineers will respond with a line-by-line system quote — including structural drawings, wind-load calculations, and content schedule plan.
Request a Facade Assessment